What does appliance installation cost?
It depends on a few things: what you're installing, how it's built in, and what the space needs before the appliances go in. Every Install KC appliance installation is quoted flat once I've seen the space or your appliance list, and quote visits are free. There's no hourly meter. I'm Scott Townsley, and I lead every job across the Kansas City metro.
Text your appliance list or a photo of the space and I'll take it from there.
Fully insured. One-year labor warranty on every install.
Why there isn't one price
Two kitchens with the same appliance list can be very different jobs. One has openings that match the spec sheets and hookups in the right place. The other needs an opening changed, a platform built and a water line moved before anything can be set.
That's why I don't post a price list. I look at the job first, then give you one flat price for it. You know the number before I start.
What drives the cost of appliance installation
- Freestanding, built-in or panel-ready: a freestanding unit slides in and gets connected. A built-in has to fit its opening, sit level and be anchored. A panel-ready unit adds the panel work on top of that.
- Custom panels and handles: panels have to be hung, adjusted and lined up so they sit flush with an even gap. Handles add time, and panel weight limits are model-specific.
- Opening modifications: if an opening doesn't match the spec sheet for your exact model, it has to be corrected before the appliance goes in.
- Platforms and cleats: some units need a platform, cleats or trim built so they sit at the right height and anchor properly.
- Gas, venting and water hookups: each connection is hooked up and tested before I leave. A hookup that's in the wrong spot, or a duct that needs an offset, adds work.
- Package size: one dishwasher is a different job than a full kitchen of columns, wall ovens, a range and a hood.
- Delivery path and moving heavy units: stairs, tight turns and finished floors all matter. Moving heavy units in from the garage can be coordinated for a fee.
- Haul-away: removing an old appliance is available as an extra and needs to be coordinated ahead of time.
I install Sub-Zero, Wolf, Cove, Thermador, Miele, Monogram, SKS and more. See appliance installation for what's included in every install.
How a flat quote works
- Send your list. Model numbers, plans or a few photos of the space. I'll text you back, usually the same day.
- Free quote visit. I look at the openings, the hookups and the delivery path.
- One flat price. Every job is quoted flat once I've seen the space or the appliance list. No hourly meter.
- Install day. Floors and cabinets covered, every unit set, leveled, anchored, connected and tested. Every install carries a one-year labor warranty.
How to keep the cost down
The surprises are what cost money: an opening that's off, a gas line in the wrong place, a duct that doesn't line up. They are cheaper to fix before install day than on it.
A Pre-Install Workup is a site visit and a written report that checks your openings, power, gas, water, venting, clearances, panel and handle specs and delivery path against the spec sheets. You get a clear fix list, and the Workup is credited toward your install.
For builders' estimators
Need an appliance installation number for a bid? Send the plans and the appliance list. I'll send back a bid number, usually the same day.
For builders and designers, the first Pre-Install Workup is free. See builders and designers for how I work with trade partners.
Questions
- How much does appliance installation cost?
- It depends on what you're installing and what the space needs. Every job is quoted flat once I've seen the space or your appliance list, and quote visits are free. There's no hourly meter.
- Is the quote visit free?
- Yes. Quote visits are free. I look at the space, the appliance list and the delivery path, then give you one flat price for the job.
- Why does a built-in or panel-ready appliance cost more to install than a freestanding one?
- There's more work in it. A built-in has to fit its opening, sit level and be anchored with anti-tip brackets. A panel-ready unit also needs its custom panels and handles hung and lined up so they sit flush with an even gap.
- Can you give a builder a bid number from plans?
- Yes. Send the plans and the appliance list and I'll send back a bid number, usually the same day.
More answers on the FAQ page.